SEWER CLEANING

LATERAL CONNECTION SEALINGIntent:The intent of lateral connection sealing is to test and seal sewer

LATERALCONNECTIONSEALING 1. Intent: Theintentoflateralconnectionsealingistotestandsealsewerlateralconnectionsusingaspecialized chemicalgroutpacker.Thepurposeofthisprocedureistheeliminationofinfiltrationintosewersthatare otherwisestructurallysound. 2. Equipment: Thebasicequipmentshallconsistofaclosedcircuittelevisionsystem,necessarychemicalsealant containers,pumps,regulators,valves,hoses,etc.,andlateralconnectionsealingpackersforthevarious sizesofsewerpipes.Thepackershallbecylindricalandhaveadiameterlessthanthepipesizeandhave cablesattachedateachendtopullitthroughtheline.Thesameequipmentshallbeusedforbothtesting andsealingsewerlateralconnections.Thepackershallcontainalateralsealinginversiontube.Thistube shouldbedesignedtoaccommodatetwosizesoflaterals,4-inchand6-inchdiameters.Theinversiontubes arconelengthtofacilitatescalingofapproximatelytwofeetofthelateral. 3. Cleaning: Lightcleaning(onepass)withajettruckwillbecompletedpriortosetupofthelateralpacker.Iflight cleaningisnotsufficientforseatingalateralpackerand/oraccessinglateralconnections,theContractor willmovetoadifferentlinesection.Heavycleaning,rootcutting,depositreaming,etc.willbeconsidered beyondthescopeofthisproject.Thistypeofworkwillbenegotiatedseparately. 4. Televising: Televisioninspectionislimitedtoa''QuickPull".Duringthisinspectiontheoperatornotesobstructions, offsetjoints,debris,thelocationoflateralconnections,andthegeneralconditionofeachlateral.The "QuickPull"inspectionisvideotaped,andonlydaiarelating(othelateralsealingreportislogged.Also duringthisinspection,theContractordetermineswhichlateralscanbeaccessed,andifthereisenough clearanceforthelateralsealingpacker.TheContractormakesthefinaldeterminationonlateralsealing packerclearance. 5. ChemicalSealingMaterials: Thechemicalgroutshallbeofatypewhichhasadocumentedrecordofsatisfactoryperformanceinsewer usage.Allgroutingmaterialsshallbedelivered(o(hejobsiteintheoriginal,labeled,andunopened containers.Contractorshallsubmitwithhisbid,thebrandnamemanufacturerofthechemicalgrout(s)(hey intendtouse.Thechemicalgrout(s)selectedbytheContractorissubjecttoapprovaloftheEngineer. GroutsshallbeAcrylicbasegelchemicalsealingmaterial-AvantiAV-100orequal. 6. LateralConnectionTesting&SealingProcedures: Lateralsareairtestedbyisolatingtheareatobetestedwiththepackerandapplyingpositivepressureinto theisolated"void"area.Asensingunitisusedforcontinuousmonitoringofthe"void"pressureThis sensingunitislocatedwithinthe"void”areaandaccuratelytransmitspressurereadouttothecontrolpanel. ThetestprocedureconsistsofapplyingairpressureintoeachisolatedVOIDarea.ToisolateaVOID,the lateralsealingpackerispositionedstraddlingthelateral.Theoperatorinflatesthepackerendstoisolatethe lateralandinsertsaninflatableinversiontube.Thelateralshallbetestedwithagaugepressureofone-half

腾讯文库SEWER