交安(中英文对照)-word资料(精)
马来西亚日产5000吨“海峡”水泥厂基础交安条件Foundation Delivery and Installation Conditions of Malaysia 5000tpd Straits
5000“” 马来西亚日产吨海峡水泥厂 基础交安条件 Foundation Delivery and Installation Conditions of Malaysia 5000tpd Straits Cement Plant 一、所有需要交安的土建基础必须具备三通一平的条件,即水通、电通、路通和场 地平整。 All the civil engineering foundations which need delivery and installation must be equipped with the condition of “three supplies and one leveling”, which means supply of water, electricity and road and leveled ground. 1、水通、电通:熟料线现场施工用水、用电均由业主从一期水泥厂提供接入口。 1.Supply of water, electricity: the owner should create an access entry for water and electricity from 1st-phase cement plant to on-spot clinker line. 2、路通:需交安基础必须具备道路通畅的条件,即从厂区大门至交安基础具备路 通的条件,并能承受重型车辆的通行。 2. Supply of road: the foundations must be equipped with smooth road, namely from the plant gate to delivery and installation foundations, and it should bear the heavy vehicles. 3、场地平整:需交安基础附近必须具备堆放设备等材料的场地,具体场地条件因 为需交安基础的特点不同由安装单位和土建单位协商确定。 3. Leveled ground: near the delivery and installation foundations, there must be aground for equipments. The detailed site conditions should be determined according to the features of delivery and installation foundations by the installation entities and civil engineering entities. 二、基础验收工作的内容,包括以下各项: The details of foundation receipt work, including: 1、预埋螺栓外露部分需保持整洁、无腐蚀情况,预埋螺栓孔应干净。 1.The exposed part of the embedded bolt should be clean and without corrosion. The hole of the embedded bolt should also be clean. 2、基础砼强度需要达到设计要求的100%强度。 2.The intensity of the foundation concrete should be 100% according to the designation. 3、需进行二次灌浆的基础部位,基础表面必须由土建单位凿毛并保证界面清洁。 3.The foundation surface of the foundation part, needing re-grout, should be chiseled until it becomes rough by the civil engineering entities and it

