ZJ70D钻机第三台泥浆泵技术改造方案
* Technical reform third mud pump of model ZJ70D rig TAN Gang-qiang YU Ming-jian LOU Chun-quan DENG Zu-zhong (Drilling and exploring company, Sichuan Petroleum Administration, chongqing ,china ) Abstract: When contract with drilling at abroad, the rig of electric -drive ZJ70D must had third mud pump, but many 7000m electric -drive rigs which introduced or made by our country had not third mud pump and sustain, the trouble of reform is mechanism and electric sect. effective borrow and refit top drive sustain by analyzed in theory and practice, content for the first side in technical specification, this text discuss how to reform mechanism and electric particular. Key word: third mud pump; pipeline; circuit; reform; debug * ZJ70D钻机第三台泥浆泵的技术改造方案 谭刚强 余明建 罗春泉 邓祖忠 (四川石油管理局钻井集团公司装备部,中国重庆邮编) 摘要:在出国承包钻井项目中,国外对ZJ70D电动钻机提出要第三台泥浆泵,然而国内及引进的7000米钻 机绝大多数都无第三台泥浆泵及接口,改装的难度在于机械和电气部分。经分析电路可用SCR房顶驱接口 改装,理论和实践证明行之有效,完全可以满足甲方的技术协议。本文就机械和电气改造作详细描述。 关键词:第三台泥浆泵 管线 电路 改造 调试 引言: 20014 年是中国石油钻机大踏步迈入国际市场的一年,我公司有台深井电驱动钻机 PDVSA 出国从事钻井技术服务,其中委内瑞拉国家石油总公司()和巴基斯坦石油有限公 PPLZJ70D1600HPZJ70D 司()要求钻机必须配备三台泥浆泵。我公司的钻机只有二台 1600HPSCR 钻井泥浆泵,且无第三台泥浆泵的安装位置和接口,房也无第三台泥浆泵的电 ZJ70D 气接口,给第三台泥浆泵的安装联接造成了困难。本文从机械和电气部分描述了钻 机是如何配置第三台泥浆泵的,供钻井现场工作和钻机设计制造单位参考。 机械部分 ZJ70D1600HP1 我公司使用的电驱动钻机为二台泥浆泵,安装示意图如图所示: 图1、ZJ70D电驱动钻机泥浆泵安装示意图 ZJ70D 电驱动钻机由二台泥浆泵改为三台泥浆泵有两种技术方案。图2所示为方案一, 图3所示为方案二。